In the Boise area, land parcels can differ dramatically in what they can support. Work through these systems before you make an offer:
Your checklist
FAQ
Q: Do I need a permit for a well?
A: Yes. Constructing a well in Idaho requires a well construction permit from the Idaho Department of Water Resources.
Q: Is septic required if there's no sewer?
A: Yes. Wastewater must be handled through a permitted on-site sewage disposal system approved by the health district.
Q: Does acreage automatically come with water for landscaping?
A: No. Irrigation water is separate from domestic water. Many parcels have it through an irrigation district or canal company, often with annual assessments, but not all do.